For a Nigerian factory, the freight bill from Shanghai, Antwerp or Mumbai is often the easy part to budget. The harder part is the last 20 or 200 kilometres: the days a container of resin, steel coil, flour, chemicals or spare parts spends between the vessel and your factory gate. Several reports published this month put numbers on that problem, and they are worth reading closely if you run procurement, production planning or supply chain for a manufacturer.

This guide pulls those figures together and turns them into a practical checklist for keeping raw materials moving and costs predictable.

What the latest reports say

Lagos ports are still slow to release containers. The World Bank’s Logistics Performance Indicators 2.0 report, published in 2025 and cited by the Independent on 30 October, found that only 0.2% of imported containers at Apapa left the port within one day. Half took up to 13.4 days to leave, and a quarter stayed more than 22.1 days. At Le Havre in France, half left within 3.8 days.

Truck turnaround varies widely by terminal. The same report cites the Nigerian Shippers’ Council’s 2024 annual report: truck turnaround averaged 280 minutes at Five Star Logistics Terminal and 180 minutes at Tin Can Island Container Terminal, against a recommended benchmark of 45 minutes. PTML and PCHS met the benchmark, which shows faster operations are possible.

Manufacturers are feeling it. At its third-quarter economic review on 14 October, the Lagos Chamber of Commerce and Industry (LCCI) said manufacturers in Apapa report trucks are still stopped by several agencies and non-state actors between the ports and their factories, and that operators estimate renewed corridor congestion has cost about ₦100 billion (PortNews Nigeria).

Delays, not tariffs, drive much of the cost. At BusinessDay’s Mobility and Logistics Conference, Obiora Madu of the Africa Centre for Supply Chain said 40% of total port cost came from accumulated truck delays, that up to 45% of trade value is lost to freight costs and inefficiency (against 5–10% elsewhere), and that this adds up to about ₦3.2 trillion a year. He also noted shipping lines typically grant importers 21 free days, which he called too short for current conditions (BusinessDay). A Chisco executive at the same event said the company buys diesel at almost ₦2,000 per litre.

There are signs of progress. APM Terminals Nigeria’s chief executive, Koen De Backker, said at the Nigerian Economic Summit that scanners introduced with Customs helped cut the average stay of import containers at its terminal from 18 days to 14 (BusinessDay). The Nigerian Ports Authority says it wants to link truck appointments with yard capacity and vessel schedules, and that the National Single Window and a beta Port Community System went live this year (The Guardian).

Why this hits manufacturers harder than most importers

A trader can often sell goods a week late. A production line can’t run on materials that are still in a terminal. Every extra day in the port chain ties up working capital, pushes up storage and container detention charges once free days run out, and can force you to buy expensive local substitutes or stop a line. Those costs rarely show up on the freight quote, so they get missed in product costing.

A port-to-factory checklist for manufacturers

1. Measure your real lead time, not the shipping line’s

Track every inbound container from vessel arrival to factory gate for the next three months: days to Customs release, days to terminal exit, days on the road, and days to return the empty. Use the median, not your best case, when you set reorder points. If half of Apapa containers take up to 13.4 days just to leave the port, a plan that assumes five days will keep failing.

2. Have documents complete before the ship berths

Most avoidable delay starts with paperwork. Make sure your Form M, PAAR, product permits (SONCAP or NAFDAC where they apply) and HS code classification are settled before arrival. If you bring in the same raw materials regularly, a Customs advance ruling on classification or valuation can stop the same argument recurring on every shipment. Our guides on the Form M and PAAR document chain and duty-paid demurrage delays go into more detail.

3. Negotiate free days before you book

Twenty-one free days can disappear quickly when exams, payments and truck queues stack up. For regular, high-volume lanes, ask the shipping line or your forwarder about extended free time on demurrage and detention before the booking is made, not after the container lands. Get the terms in writing and note the exact start date for the clock.

4. Plan trucks around release, not hope

Book haulage once release is likely, and keep the trucker’s Eto call-up details and the terminal’s collection windows in one place. Missed slots mean another trip and another day. Ask your haulier which terminals have been fastest recently, since turnaround differs so much between them. Our Lagos port roads and e-call-up guide covers the basics.

5. Look at alternatives to the Apapa road

For factories in Ogun, Oyo and further north, rail through the Apapa–Moniya line in Ibadan is worth testing for suitable cargo, especially if you also export. See our post on Apapa–Moniya rail for containers. Eastern ports and inland dry ports can also make sense depending on where your plant is. Compare the total door-to-door time and cost, not just the haulage rate.

6. Budget for diesel and corridor costs honestly

With operators reporting diesel near ₦2,000 per litre and trips that run far longer than planned, build fuel surcharges and waiting time into your landed-cost sheet. Ask hauliers for written quotes that state what is and isn’t included.

7. Report unofficial demands, don’t absorb them

LCCI says trucks are still being stopped between ports and factories. Keep records of any demand for payment that has no receipt, and escalate through official channels such as the Nigerian Ports Economic Regulatory Agency (NPERA), which says protecting port users from unreasonable charges is part of its role. Our NPERA explainer explains what the regulator covers.

8. Keep a buffer for critical inputs

For materials that would stop production if they ran out, hold safety stock that matches your real port lead time, or split orders across two shipments so one delay doesn’t halt the line. It costs money to hold stock, but it usually costs less than an idle factory.

What to watch next

The second phase of the National Single Window, covering export permits, is expected in November, and NPA’s push to link truck appointments with yard and vessel planning could shorten dwell times if it works as described. Nigerian Railway Corporation chief Kayode Opeifa told the BusinessDay conference he plans to meet NPERA, NPA and freight associations before the end of November to discuss logistics costs. Until those changes show up in your own numbers, plan on today’s timelines.

How Septmax can help

Septmax Logistics handles freight forwarding, customs clearance and haulage for manufacturers bringing raw materials, machinery and spare parts into Nigeria, including China-to-Nigeria door-to-door shipping. If you want help mapping your port-to-factory timeline or planning your next inbound shipment, call +234-707-476-0270 or email logistics@septmax.com.